KPIs & Operating Metrics(New)
Growth Metrics

Black Hills (BKH) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Black Hills (BKH) over the last 16 years, with Q4 2025 value amounting to $270.1 million.

  • Black Hills' Construction in Progress rose 412.49% to $270.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $270.1 million, marking a year-over-year increase of 412.49%. This contributed to the annual value of $270.1 million for FY2025, which is 412.49% up from last year.
  • As of Q4 2025, Black Hills' Construction in Progress stood at $270.1 million, which was up 412.49% from $259.4 million recorded in Q4 2024.
  • Black Hills' 5-year Construction in Progress high stood at $270.1 million for Q4 2025, and its period low was $123.1 million during Q4 2023.
  • For the 5-year period, Black Hills' Construction in Progress averaged around $197.4 million, with its median value being $181.5 million (2021).
  • Per our database at Business Quant, Black Hills' Construction in Progress plummeted by 1954.25% in 2023 and then soared by 11072.3% in 2024.
  • Black Hills' Construction in Progress (Quarter) stood at $181.5 million in 2021, then decreased by 15.68% to $153.0 million in 2022, then decreased by 19.54% to $123.1 million in 2023, then skyrocketed by 110.72% to $259.4 million in 2024, then increased by 4.12% to $270.1 million in 2025.
  • Its Construction in Progress was $270.1 million in Q4 2025, compared to $259.4 million in Q4 2024 and $123.1 million in Q4 2023.