KPIs & Operating Metrics(New)
Growth Metrics

Black Hills (BKH) Construction in Progress (2016 - 2025)

Black Hills has reported Construction in Progress over the past 16 years, most recently at $50.5 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 80.53% year-over-year to $50.5 million; the TTM value through Dec 2025 reached $50.5 million, down 80.53%, while the annual FY2025 figure was $50.5 million, 80.53% down from the prior year.
  • Construction in Progress for Q4 2025 was $50.5 million at Black Hills, down from $259.4 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $259.4 million in Q4 2024 and troughed at $8.5 million in Q4 2021.
  • A 5-year average of $97.0 million and a median of $50.5 million in 2025 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: tumbled 91.11% in 2023 and later skyrocketed 1807.35% in 2024.
  • Year by year, Construction in Progress stood at $8.5 million in 2021, then skyrocketed by 1708.51% to $153.0 million in 2022, then tumbled by 91.11% to $13.6 million in 2023, then skyrocketed by 1807.35% to $259.4 million in 2024, then crashed by 80.53% to $50.5 million in 2025.
  • Business Quant data shows Construction in Progress for BKH at $50.5 million in Q4 2025, $259.4 million in Q4 2024, and $13.6 million in Q4 2023.