Brookfield Renewable Corp (BEPC) Construction in Progress (2019 - 2026)
Brookfield Renewable (BEPC) posted quarterly Construction in Progress of $2.0 billion for Q2 2026, up 5.22% on a QoQ basis from $1.9 billion in Q4 2025.
Analysis
Brookfield Renewable Corp (BEPC) Construction in Progress (2019 - 2026) Analysis & Trends
Brookfield Renewable has reported Construction in Progress for 8 years, with the latest figure at $2.0 billion in Q2 2026.
- Construction in Progress for Q2 2026 came in at $2.0 billion, changed N/A year-over-year; the trailing twelve-month figure through Jun 2026 was $2.0 billion (changed N/A YoY), and the FY2025 annual result was $1.9 billion, up 34.3% from the prior year.
- Construction in Progress climbed to $2.0 billion in Q2 2026, from $1.9 billion in the prior quarter.
- Over five years, Construction in Progress peaked at $2.0 billion in Q2 2026 and troughed at $1.1 billion in Q4 2022.
- A 5-year average of $1.4 billion and a median of $1.3 billion in 2022 frame the typical range for Construction in Progress.
- The widest annual swing landed in 2022, when Construction in Progress jumped 243.68%; it then retreated 22.02% in 2024.
- A 5-year view of Construction in Progress shows it stood at $1.1 billion in 2022, then surged by 62.64% to $1.8 billion in 2023, then decreased by 22.02% to $1.4 billion in 2024, then surged by 34.3% to $1.9 billion in 2025, then grew by 5.22% to $2.0 billion in 2026.
- Per Business Quant data, the three most recent Construction in Progress figures were $2.0 billion in Q2 2026, $1.9 billion in Q4 2025, and $1.4 billion in Q4 2024.
Peer Set
Peer Comparison
Historic Data
Download Data
Historic Data
| Date | Value |
|---|---|
| Jun 30, 2026 | 1.96 Bn |
| Dec 31, 2025 | 1.86 Bn |
| Dec 31, 2024 | 1.39 Bn |
| Jun 30, 2024 | 1.19 Bn |
| Dec 31, 2023 | 1.78 Bn |
| Jun 30, 2023 | 1.14 Bn |
| Dec 31, 2022 | 1.09 Bn |
| Jun 30, 2022 | 1.20 Bn |
| Dec 31, 2021 | 776.00 Mn |
| Jun 30, 2021 | 348.00 Mn |
| Dec 31, 2020 | 452.00 Mn |
| Dec 31, 2019 | 188.00 Mn |