Growth Metrics

Avricore Health (AVCRF) Construction in Progress (2016 - 2017)

Avricore Health has reported Construction in Progress over the past 2 years, most recently at $31363.7 for Q4 2017.

  • Quarterly Construction in Progress rose 598.77% to $31363.7 in Q4 2017 from the year-ago period, while the trailing twelve-month figure was $31363.7 through Dec 2017, up 598.77% year-over-year, with the annual reading at $30712.6 for FY2017, 584.26% up from the prior year.
  • Construction in Progress was $31363.7 for Q4 2017 at Avricore Health, up from $4488.4 in the prior quarter.
  • Over five years, Construction in Progress peaked at $31363.7 in Q4 2017 and troughed at $4488.4 in Q4 2016.