Astronics Corp (ATROB) Construction in Progress (2010 - 2017)

Astronics (ATROB) posted Construction in Progress of $9.8 million for Q4 2017, up 19.3% sequentially from $8.2 million in Q4 2016, and up 19.3% YoY from $8.2 million in Q4 2016.

Astronics Corp (ATROB) Construction in Progress (2010 - 2017) Analysis & Trends

Astronics has reported Construction in Progress for 8 years, with the latest figure at $9.8 million in Q4 2017.

  • Quarterly Construction in Progress rose 19.3% year-over-year to $9.8 million in Q4 2017, while the trailing twelve-month figure through Dec 2017 was $9.8 million (up 19.3% YoY) and the FY2017 annual result came in at $9.8 million, up 19.3% from the prior year.
  • Construction in Progress rose to $9.8 million in Q4 2017 per ATROB's latest filing, from $8.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $9.8 million in Q4 2017 and troughed at $1.5 million in Q4 2013.
  • A 5-year average of $5.5 million and a median of $4.8 million in 2014 frame the typical range for Construction in Progress.
  • The sharpest annual moves came in 2014 and 2015: Construction in Progress jumped 211.53% in 2014, then plunged 31.01% in 2015.
  • Over 5 years, Construction in Progress stood at $1.5 million in 2013, then surged by 211.53% to $4.8 million in 2014, then slumped by 31.01% to $3.3 million in 2015, then soared by 149.3% to $8.2 million in 2016, then grew by 19.3% to $9.8 million in 2017.
  • According to Business Quant data, Construction in Progress over the past three periods registered $9.8 million, $8.2 million, and $3.3 million for Q4 2017, Q4 2016, and Q4 2015 respectively.

Peer Comparison

Historic Data

Download Data
DateValue
Dec 31, 2017 9.76 Mn
Dec 31, 2016 8.18 Mn
Dec 31, 2015 3.28 Mn
Dec 31, 2014 4.76 Mn
Dec 31, 2013 1.53 Mn
Dec 31, 2012 1.46 Mn
Dec 31, 2011 7.70 Mn
Dec 31, 2010 1.56 Mn