Growth Metrics

Astronics (ATROB) Construction in Progress (2016 - 2017)

Historic Construction in Progress for Astronics (ATROB) over the last 8 years, with Q4 2017 value amounting to $9.8 million.

  • Astronics' Construction in Progress rose 1929.85% to $9.8 million in Q4 2017 from the same period last year, while for Dec 2017 it was $9.8 million, marking a year-over-year increase of 1929.85%. This contributed to the annual value of $9.8 million for FY2017, which is 1929.85% up from last year.
  • Latest data reveals that Astronics reported Construction in Progress of $9.8 million as of Q4 2017, which was up 1929.85% from $8.2 million recorded in Q4 2016.
  • Over the past 5 years, Astronics' Construction in Progress peaked at $9.8 million during Q4 2017, and registered a low of $1.5 million during Q4 2013.
  • Over the past 5 years, Astronics' median Construction in Progress value was $4.8 million (recorded in 2014), while the average stood at $5.5 million.
  • Per our database at Business Quant, Astronics' Construction in Progress skyrocketed by 21152.59% in 2014 and then crashed by 3100.69% in 2015.
  • Quarter analysis of 5 years shows Astronics' Construction in Progress stood at $1.5 million in 2013, then skyrocketed by 211.53% to $4.8 million in 2014, then plummeted by 31.01% to $3.3 million in 2015, then surged by 149.3% to $8.2 million in 2016, then increased by 19.3% to $9.8 million in 2017.
  • Its Construction in Progress was $9.8 million in Q4 2017, compared to $8.2 million in Q4 2016 and $3.3 million in Q4 2015.