Growth Metrics

Allurion Technologies (ALUR) Construction in Progress (2022 - 2025)

Historic Construction in Progress for Allurion Technologies (ALUR) over the last 4 years, with Q2 2025 value amounting to $3000.0.

  • Allurion Technologies' Construction in Progress fell 9977.17% to $3000.0 in Q2 2025 from the same period last year, while for Jun 2025 it was $3000.0, marking a year-over-year decrease of 9977.17%. This contributed to the annual value of $14000.0 for FY2024, which is 9882.85% down from last year.
  • As of Q2 2025, Allurion Technologies' Construction in Progress stood at $3000.0, which was down 9977.17% from $14000.0 recorded in Q1 2025.
  • In the past 5 years, Allurion Technologies' Construction in Progress ranged from a high of $1.3 million in Q2 2024 and a low of $3000.0 during Q2 2025
  • In the last 4 years, Allurion Technologies' Construction in Progress had a median value of $659000.0 in 2023 and averaged $640111.1.
  • Per our database at Business Quant, Allurion Technologies' Construction in Progress soared by 10497.43% in 2023 and then tumbled by 9977.17% in 2025.
  • Allurion Technologies' Construction in Progress (Quarter) stood at $583000.0 in 2022, then soared by 104.97% to $1.2 million in 2023, then crashed by 98.83% to $14000.0 in 2024, then plummeted by 78.57% to $3000.0 in 2025.
  • Its last three reported values are $3000.0 in Q2 2025, $14000.0 for Q1 2025, and $14000.0 during Q4 2024.