Growth Metrics

Allurion Technologies (ALUR) Construction in Progress (2022 - 2025)

Allurion Technologies filings provide 4 years of Construction in Progress readings, the most recent being $3000.0 for Q2 2025.

  • On a quarterly basis, Construction in Progress fell 99.77% to $3000.0 in Q2 2025 year-over-year; TTM through Jun 2025 was $3000.0, a 99.77% decrease, with the full-year FY2024 number at $14000.0, down 98.83% from a year prior.
  • Construction in Progress hit $3000.0 in Q2 2025 for Allurion Technologies, down from $14000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.3 million in Q2 2024 to a low of $3000.0 in Q2 2025.
  • Median Construction in Progress over the past 4 years was $659000.0 (2023), compared with a mean of $640111.1.
  • Biggest five-year swings in Construction in Progress: soared 104.97% in 2023 and later crashed 99.77% in 2025.
  • Allurion Technologies' Construction in Progress stood at $583000.0 in 2022, then soared by 104.97% to $1.2 million in 2023, then tumbled by 98.83% to $14000.0 in 2024, then plummeted by 78.57% to $3000.0 in 2025.
  • The last three reported values for Construction in Progress were $3000.0 (Q2 2025), $14000.0 (Q1 2025), and $14000.0 (Q4 2024) per Business Quant data.