Allurion Technologies, Inc. (ALUR) Construction in Progress (2022 - 2025)
Allurion Technologies' (ALUR) quarterly Construction in Progress came in at $3000.0 in Q2 2025, down 99.77% YoY from $1.3 million in Q2 2024, and down 78.57% on a QoQ basis from $14000.0 in Q1 2025.
Allurion Technologies, Inc. (ALUR) Construction in Progress (2022 - 2025) Analysis & Trends
Allurion Technologies (ALUR) has 4 years of Construction in Progress data on file, last reported at $3000.0 in Q2 2025.
- Quarterly Construction in Progress fell 99.77% year-over-year to $3000.0 in Q2 2025, while the trailing twelve-month figure through Jun 2025 was $3000.0 (down 99.77% YoY) and the FY2024 annual result came in at $14000.0, down 98.83% from the prior year.
- Construction in Progress eased to $3000.0 in Q2 2025, from $14000.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.3 million in Q2 2024 to a low of $3000.0 in Q2 2025.
- A 4-year average of $640111.1 and a median of $659000.0 in 2023 frame the typical range for Construction in Progress.
- Annual changes were most pronounced in 2023 — Construction in Progress jumped 104.97% — and 2025, when it plunged 99.77%.
- Tracing ALUR's Construction in Progress over 4 years: stood at $583000.0 in 2022, then jumped by 104.97% to $1.2 million in 2023, then plunged by 98.83% to $14000.0 in 2024, then plunged by 78.57% to $3000.0 in 2025.
- The last three Construction in Progress figures came in at $3000.0 (Q2 2025), $14000.0 (Q1 2025), and $14000.0 (Q4 2024), per Business Quant data.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Jun 30, 2025 | 3,000.00 |
| Mar 31, 2025 | 14,000.00 |
| Dec 31, 2024 | 14,000.00 |
| Sep 30, 2024 | 890,000.00 |
| Jun 30, 2024 | 1.31 Mn |
| Mar 31, 2024 | 1.09 Mn |
| Dec 31, 2023 | 1.20 Mn |
| Jun 30, 2023 | 659,000.00 |
| Dec 31, 2022 | 583,000.00 |