Allurion Technologies (ALUR) Construction in Progress (2022 - 2025)
Allurion Technologies' Construction in Progress history spans 4 years, with the latest figure at $3000.0 for Q2 2025.
- For Q2 2025, Construction in Progress fell 99.77% year-over-year to $3000.0; the TTM value through Jun 2025 reached $3000.0, down 99.77%, while the annual FY2024 figure was $14000.0, 98.83% down from the prior year.
- Construction in Progress reached $3000.0 in Q2 2025 per ALUR's latest filing, down from $14000.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.3 million in Q2 2024 to a low of $3000.0 in Q2 2025.
- Average Construction in Progress over 4 years is $640111.1, with a median of $659000.0 recorded in 2023.
- Peak YoY movement for Construction in Progress: surged 104.97% in 2023, then tumbled 99.77% in 2025.
- A 4-year view of Construction in Progress shows it stood at $583000.0 in 2022, then soared by 104.97% to $1.2 million in 2023, then tumbled by 98.83% to $14000.0 in 2024, then plummeted by 78.57% to $3000.0 in 2025.
- Per Business Quant, the three most recent readings for ALUR's Construction in Progress are $3000.0 (Q2 2025), $14000.0 (Q1 2025), and $14000.0 (Q4 2024).