Xcel Energy Inc (XELLL) Construction in Progress (2009 - 2026)
Xcel Energy (XELLL) posted Construction in Progress of $9.8 billion for Q2 2026, up 4.18% sequentially from $9.4 billion in Q1 2026, and up 48.77% YoY from $6.6 billion in Q2 2025.
Xcel Energy Inc (XELLL) Construction in Progress (2009 - 2026) Analysis & Trends
Xcel Energy has reported Construction in Progress for 6 years, with the latest figure at $9.8 billion in Q2 2026.
- Quarterly Construction in Progress rose 48.77% year-over-year to $9.8 billion in Q2 2026, while the trailing twelve-month figure through Jun 2026 was $9.8 billion (up 48.77% YoY) and the FY2025 annual result came in at $8.1 billion, up 71.29% from the prior year.
- Construction in Progress grew to $9.8 billion in Q2 2026 per XELLL's latest filing, from $9.4 billion in the prior quarter.
- Over five years, Construction in Progress peaked at $9.8 billion in Q2 2026 and troughed at $2.9 billion in Q4 2023.
- A 4-year average of $6.7 billion and a median of $6.6 billion in 2025 frame the typical range for Construction in Progress.
- The sharpest annual moves came in 2025 and 2026: Construction in Progress jumped 71.29% in 2025, then surged 48.77% in 2026.
- Over 4 years, Construction in Progress stood at $2.9 billion in 2023, then jumped by 64.29% to $4.7 billion in 2024, then surged by 71.29% to $8.1 billion in 2025, then grew by 21.65% to $9.8 billion in 2026.
- According to Business Quant data, Construction in Progress over the past three periods registered $9.8 billion, $9.4 billion, and $8.1 billion for Q2 2026, Q1 2026, and Q4 2025 respectively.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Jun 30, 2026 | 9.84 Bn |
| Mar 31, 2026 | 9.44 Bn |
| Dec 31, 2025 | 8.09 Bn |
| Sep 30, 2025 | 8.02 Bn |
| Jun 30, 2025 | 6.61 Bn |
| Mar 31, 2025 | 5.96 Bn |
| Dec 31, 2024 | 4.72 Bn |
| Sep 30, 2024 | 4.85 Bn |
| Dec 31, 2023 | 2.87 Bn |
| Dec 31, 2010 | 1.19 Bn |
| Sep 30, 2010 | 1.67 Bn |
| Jun 30, 2010 | 1.36 Bn |
| Dec 31, 2009 | 1.77 Bn |