Tsakos Energy Navigation (TEN-PF) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Tsakos Energy Navigation (TEN-PF) over the last 17 years, with Q3 2025 value amounting to $355.8 million.
- Tsakos Energy Navigation's Construction in Progress rose 4438.94% to $355.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $355.8 million, marking a year-over-year increase of 4438.94%. This contributed to the annual value of -$160.4 million for FY2024, which is 20653.36% down from last year.
- Tsakos Energy Navigation's Construction in Progress amounted to $355.8 million in Q3 2025, which was up 4438.94% from -$126.2 million recorded in Q2 2025.
- Over the past 5 years, Tsakos Energy Navigation's Construction in Progress peaked at $246.4 billion during Q4 2024, and registered a low of -$126.2 million during Q2 2025.
- Its 5-year average for Construction in Progress is $14.5 billion, with a median of $68.1 million in 2021.
- In the last 5 years, Tsakos Energy Navigation's Construction in Progress plummeted by 26360.14% in 2023 and then skyrocketed by 16353406.94% in 2024.
- Tsakos Energy Navigation's Construction in Progress (Quarter) stood at -$55.6 million in 2021, then surged by 42.79% to -$31.8 million in 2022, then soared by 573.37% to $150.6 million in 2023, then soared by 163534.07% to $246.4 billion in 2024, then plummeted by 99.86% to $355.8 million in 2025.
- Its Construction in Progress was $355.8 million in Q3 2025, compared to -$126.2 million in Q2 2025 and $246.4 billion in Q4 2024.