Tsakos Energy Navigation (TEN-PE) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Tsakos Energy Navigation (TEN-PE) over the last 17 years, with Q3 2025 value amounting to $355.8 million.
- Tsakos Energy Navigation's Construction in Progress rose 4438.94% to $355.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $355.8 million, marking a year-over-year increase of 4438.94%. This contributed to the annual value of -$160.4 million for FY2024, which is 20653.36% down from last year.
- As of Q3 2025, Tsakos Energy Navigation's Construction in Progress stood at $355.8 million, which was up 4438.94% from -$126.2 million recorded in Q2 2025.
- Tsakos Energy Navigation's Construction in Progress' 5-year high stood at $246.4 billion during Q4 2024, with a 5-year trough of -$126.2 million in Q2 2025.
- In the last 5 years, Tsakos Energy Navigation's Construction in Progress had a median value of $68.1 million in 2021 and averaged $14.5 billion.
- Per our database at Business Quant, Tsakos Energy Navigation's Construction in Progress plummeted by 26360.14% in 2023 and then skyrocketed by 16353406.94% in 2024.
- Tsakos Energy Navigation's Construction in Progress (Quarter) stood at -$55.6 million in 2021, then surged by 42.79% to -$31.8 million in 2022, then soared by 573.37% to $150.6 million in 2023, then soared by 163534.07% to $246.4 billion in 2024, then plummeted by 99.86% to $355.8 million in 2025.
- Its last three reported values are $355.8 million in Q3 2025, -$126.2 million for Q2 2025, and $246.4 billion during Q4 2024.