Growth Metrics

Tc Energy (TCEYF) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Tc Energy (TCEYF) over the last 14 years, with Q4 2025 value amounting to -$11.5 million.

  • Tc Energy's Construction in Progress fell 10977.5% to -$11.5 million in Q4 2025 from the same period last year, while for Dec 2025 it was -$11.5 million, marking a year-over-year decrease of 10977.5%. This contributed to the annual value of -$11.5 million for FY2025, which is 10956.28% down from last year.
  • As of Q4 2025, Tc Energy's Construction in Progress stood at -$11.5 million, which was down 10977.5% from $8.7 million recorded in Q3 2025.
  • Tc Energy's Construction in Progress' 5-year high stood at $117.4 million during Q4 2024, with a 5-year trough of -$104.3 million in Q4 2023.
  • Its 5-year average for Construction in Progress is -$13.9 million, with a median of -$14.8 million in 2024.
  • Per our database at Business Quant, Tc Energy's Construction in Progress crashed by 46216.81% in 2023 and then soared by 21255.49% in 2024.
  • Tc Energy's Construction in Progress (Quarter) stood at $33.3 million in 2021, then soared by 118.89% to $72.9 million in 2022, then crashed by 243.01% to -$104.3 million in 2023, then soared by 212.55% to $117.4 million in 2024, then tumbled by 109.78% to -$11.5 million in 2025.
  • Its last three reported values are -$11.5 million in Q4 2025, $8.7 million for Q3 2025, and -$7.2 million during Q2 2025.