Power REIT (PW-PA) Construction in Progress (2020 - 2022)

Power REIT's Construction in Progress history spans 3 years, with the latest figure at $22.5 million for Q3 2022.

  • For Q3 2022, Construction in Progress rose 146.69% year-over-year to $22.5 million; the TTM value through Sep 2022 reached $22.5 million, up 146.69%, while the annual FY2021 figure was $11.2 million, 434.25% up from the prior year.
  • Construction in Progress reached $22.5 million in Q3 2022 per PW-PA's latest filing, up from $20.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $22.5 million in Q3 2022 to a low of $2.1 million in Q4 2020.
  • Average Construction in Progress over 3 years is $11.8 million, with a median of $10.1 million recorded in 2021.
  • The largest YoY upside for Construction in Progress was 462.06% in 2022 against a maximum downside of 146.69% in 2022.
  • A 3-year view of Construction in Progress shows it stood at $2.1 million in 2020, then surged by 434.25% to $11.2 million in 2021, then skyrocketed by 101.67% to $22.5 million in 2022.
  • Per Business Quant, the three most recent readings for PW-PA's Construction in Progress are $22.5 million (Q3 2022), $20.2 million (Q2 2022), and $19.3 million (Q1 2022).