Microvast Holdings (MVSTW) Construction in Progress (2020 - 2025)
Microvast Holdings has reported Construction in Progress over the past 6 years, most recently at $240.4 million for Q4 2025.
- Quarterly results put Construction in Progress at $240.4 million for Q4 2025, up 22.56% from a year ago — trailing twelve months through Dec 2025 was $240.4 million (up 22.56% YoY), and the annual figure for FY2025 was $240.4 million, up 22.56%.
- Construction in Progress for Q4 2025 was $240.4 million at Microvast Holdings, up from $196.1 million in the prior quarter.
- Over the last five years, Construction in Progress for MVSTW hit a ceiling of $321.9 million in Q4 2023 and a floor of $97.0 million in Q4 2021.
- Median Construction in Progress over the past 5 years was $196.1 million (2024), compared with a mean of $210.2 million.
- Biggest five-year swings in Construction in Progress: skyrocketed 101.65% in 2022 and later crashed 39.08% in 2024.
- Microvast Holdings' Construction in Progress stood at $97.0 million in 2021, then skyrocketed by 101.65% to $195.5 million in 2022, then soared by 64.63% to $321.9 million in 2023, then crashed by 39.08% to $196.1 million in 2024, then rose by 22.56% to $240.4 million in 2025.
- The last three reported values for Construction in Progress were $240.4 million (Q4 2025), $196.1 million (Q4 2024), and $321.9 million (Q4 2023) per Business Quant data.