Middlesex Water (MSEXP) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Middlesex Water (MSEXP) over the last 16 years, with Q3 2025 value amounting to $37.4 million.
- Middlesex Water's Construction in Progress rose 699.81% to $37.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $37.4 million, marking a year-over-year increase of 699.81%. This contributed to the annual value of $34.2 million for FY2024, which is 7421.57% up from last year.
- Latest data reveals that Middlesex Water reported Construction in Progress of $37.4 million as of Q3 2025, which was up 699.81% from $43.6 million recorded in Q2 2025.
- Over the past 5 years, Middlesex Water's Construction in Progress peaked at $89.7 million during Q1 2021, and registered a low of $19.3 million during Q3 2021.
- Moreover, its 5-year median value for Construction in Progress was $36.8 million (2023), whereas its average is $40.4 million.
- In the last 5 years, Middlesex Water's Construction in Progress crashed by 7371.56% in 2021 and then surged by 20685.27% in 2022.
- Quarter analysis of 5 years shows Middlesex Water's Construction in Progress stood at $24.9 million in 2021, then skyrocketed by 114.74% to $53.6 million in 2022, then crashed by 63.35% to $19.6 million in 2023, then soared by 74.22% to $34.2 million in 2024, then rose by 9.46% to $37.4 million in 2025.
- Its Construction in Progress stands at $37.4 million for Q3 2025, versus $43.6 million for Q2 2025 and $32.2 million for Q1 2025.