Growth Metrics

Magnolia Oil & Gas (MGY) Construction in Progress (2019 - 2025)

Magnolia Oil & Gas' Construction in Progress history spans 7 years, with the latest figure at $20.6 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 10.16% year-over-year to $20.6 million; the TTM value through Dec 2025 reached $20.6 million, up 10.16%, while the annual FY2025 figure was $20.6 million, 10.16% up from the prior year.
  • Construction in Progress reached $20.6 million in Q4 2025 per MGY's latest filing, up from $20.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $28.7 million in Q1 2025 to a low of $4.9 million in Q1 2021.
  • Average Construction in Progress over 5 years is $12.6 million, with a median of $9.5 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: grew 8.71% in 2023, then skyrocketed 178.04% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $7.0 million in 2021, then increased by 27.79% to $9.0 million in 2022, then rose by 8.71% to $9.8 million in 2023, then surged by 91.49% to $18.7 million in 2024, then rose by 10.16% to $20.6 million in 2025.
  • Per Business Quant, the three most recent readings for MGY's Construction in Progress are $20.6 million (Q4 2025), $20.5 million (Q3 2025), and $20.5 million (Q2 2025).