Magnolia Oil & Gas (MGY) Construction in Progress (2018 - 2026)
Magnolia Oil & Gas filings provide 8 years of Construction in Progress readings, the most recent being $20.6 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 10.16% to $20.6 million in Q4 2025 year-over-year; TTM through Dec 2025 was $20.6 million, a 10.16% increase, with the full-year FY2025 number at $20.6 million, up 10.16% from a year prior.
- Construction in Progress hit $20.6 million in Q4 2025 for Magnolia Oil & Gas, up from $20.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $28.7 million in Q1 2025 to a low of $4.9 million in Q1 2021.
- Median Construction in Progress over the past 5 years was $9.5 million (2023), compared with a mean of $12.6 million.
- Biggest five-year swings in Construction in Progress: increased 8.71% in 2023 and later surged 178.04% in 2025.
- Magnolia Oil & Gas' Construction in Progress stood at $7.0 million in 2021, then increased by 27.79% to $9.0 million in 2022, then rose by 8.71% to $9.8 million in 2023, then surged by 91.49% to $18.7 million in 2024, then rose by 10.16% to $20.6 million in 2025.
- The last three reported values for Construction in Progress were $20.6 million (Q4 2025), $20.5 million (Q3 2025), and $20.5 million (Q2 2025) per Business Quant data.