Southwest Airlines (LUV) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Southwest Airlines (LUV) over the last 14 years, with Q4 2025 value amounting to $88.0 million.
- Southwest Airlines' Construction in Progress changed 0.0% to $88.0 million in Q4 2025 from the same period last year, while for Dec 2025 it was $88.0 million, marking a year-over-year change of 0.0%. This contributed to the annual value of $88.0 million for FY2025, which is 0.0% changed from last year.
- According to the latest figures from Q4 2025, Southwest Airlines' Construction in Progress is $88.0 million, which was down 0.0% from $88.0 million recorded in Q3 2025.
- Southwest Airlines' Construction in Progress' 5-year high stood at $341.0 million during Q1 2021, with a 5-year trough of $3.0 million in Q3 2021.
- For the 5-year period, Southwest Airlines' Construction in Progress averaged around $67.5 million, with its median value being $62.0 million (2023).
- As far as peak fluctuations go, Southwest Airlines' Construction in Progress plummeted by 9890.51% in 2021, and later skyrocketed by 53333.33% in 2022.
- Over the past 5 years, Southwest Airlines' Construction in Progress (Quarter) stood at $6.0 million in 2021, then surged by 366.67% to $28.0 million in 2022, then surged by 121.43% to $62.0 million in 2023, then skyrocketed by 41.94% to $88.0 million in 2024, then changed by 0.0% to $88.0 million in 2025.
- Its Construction in Progress stands at $88.0 million for Q4 2025, versus $88.0 million for Q3 2025 and $88.0 million for Q2 2025.