AEye, Inc. (LIDRW) Work In Process (2023 - 2025)

AEye's (LIDRW) quarterly Work In Process came in at $78000.0 in Q4 2025, down 81.34% on a QoQ basis from $418000.0 in Q3 2025.

AEye, Inc. (LIDRW) Work In Process (2023 - 2025) Analysis & Trends

AEye (LIDRW) has 3 years of Work In Process data on file, last reported at $78000.0 in Q4 2025.

  • On a quarterly basis, Work In Process changed N/A year-over-year to $78000.0 in Q4 2025; TTM through Dec 2025 was $78000.0, a N/A change from a year earlier, with the FY2025 full-year figure at $78000.0, changed N/A from the prior year.
  • Work In Process for Q4 2025 stood at $78000.0, down from $418000.0 in the prior quarter.
  • Over the last five years, Work In Process for LIDRW reached as high as $418000.0 in Q3 2025 and fell as low as $65000.0 in Q3 2024.
  • Historically, Work In Process has averaged $168600.0 across 3 years, with a median of $123000.0 in 2024.
  • On a YoY basis, Work In Process climbed as much as 543.08% in 2025 and fell as far as 543.08% in 2025.
  • Year by year, Work In Process stood at $159000.0 in 2023, then plunged by 59.12% to $65000.0 in 2024, then advanced by 20.0% to $78000.0 in 2025.
  • Per Business Quant data, the three most recent Work In Process figures were $78000.0 in Q4 2025, $418000.0 in Q3 2025, and $65000.0 in Q3 2024.

Peer Comparison

Historic Data

Download Data
DateValue
Dec 31, 2025 78,000.00
Sep 30, 2025 418,000.00
Sep 30, 2024 65,000.00
Jun 30, 2024 123,000.00
Dec 31, 2023 159,000.00