Gladstone Land (LANDO) Construction in Progress (2023 - 2025)
Gladstone Land has reported Construction in Progress over the past 3 years, most recently at $1.5 million for Q3 2025.
- Quarterly results put Construction in Progress at $1.5 million for Q3 2025, up 7.14% from a year ago — trailing twelve months through Sep 2025 was $1.5 million (up 7.14% YoY), and the annual figure for FY2024 was $1.4 million, down 22.22%.
- Construction in Progress for Q3 2025 was $1.5 million at Gladstone Land, up from $1.4 million in the prior quarter.
- Over the last five years, Construction in Progress for LANDO hit a ceiling of $1.8 million in Q4 2023 and a floor of $1.4 million in Q2 2024.
- Median Construction in Progress over the past 3 years was $1.4 million (2024), compared with a mean of $1.5 million.
- Biggest five-year swings in Construction in Progress: dropped 22.22% in 2024 and later grew 7.14% in 2025.
- Gladstone Land's Construction in Progress stood at $1.8 million in 2023, then dropped by 22.22% to $1.4 million in 2024, then grew by 7.14% to $1.5 million in 2025.
- The last three reported values for Construction in Progress were $1.5 million (Q3 2025), $1.4 million (Q2 2025), and $1.4 million (Q1 2025) per Business Quant data.