Hudson Pacific Properties (HPP-PC) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Hudson Pacific Properties (HPP-PC) over the last 10 years, with Q2 2018 value amounting to $303.3 million.

  • Hudson Pacific Properties' Construction in Progress rose 2246.34% to $303.3 million in Q2 2018 from the same period last year, while for Jun 2018 it was $303.3 million, marking a year-over-year increase of 2246.34%. This contributed to the annual value of $219.2 million for FY2017, which is 2574.47% down from last year.
  • Hudson Pacific Properties' Construction in Progress amounted to $303.3 million in Q2 2018, which was up 2246.34% from $219.2 million recorded in Q4 2017.
  • In the past 5 years, Hudson Pacific Properties' Construction in Progress ranged from a high of $303.3 million in Q2 2018 and a low of $78.0 million during Q1 2014
  • Over the past 5 years, Hudson Pacific Properties' median Construction in Progress value was $203.4 million (recorded in 2016), while the average stood at $192.4 million.
  • As far as peak fluctuations go, Hudson Pacific Properties' Construction in Progress surged by 16641.79% in 2014, and later tumbled by 2574.47% in 2017.
  • Over the past 5 years, Hudson Pacific Properties' Construction in Progress (Quarter) stood at $135.8 million in 2014, then increased by 27.35% to $173.0 million in 2015, then skyrocketed by 70.65% to $295.2 million in 2016, then fell by 25.74% to $219.2 million in 2017, then soared by 38.33% to $303.3 million in 2018.
  • Its last three reported values are $303.3 million in Q2 2018, $219.2 million for Q4 2017, and $265.7 million during Q3 2017.