KPIs & Operating Metrics(New)
Growth Metrics

Hudbay Minerals (HBM) Work In Process (2016 - 2017)

Hudbay Minerals has reported Work In Process over the past 6 years, most recently at $11485.2 for Q2 2017.

  • Quarterly Work In Process fell 99.84% to $11485.2 in Q2 2017 from the year-ago period, while the trailing twelve-month figure was $11485.2 through Jun 2017, down 99.84% year-over-year, with the annual reading at $6872.7 for FY2016, 99.89% down from the prior year.
  • Work In Process was $11485.2 for Q2 2017 at Hudbay Minerals, up from $6822.2 in the prior quarter.
  • Over five years, Work In Process peaked at $11.9 billion in Q3 2014 and troughed at $6822.2 in Q4 2016.
  • The 5-year median for Work In Process is $6.2 million (2015), against an average of $2.8 billion.
  • Year-over-year, Work In Process soared 286243.14% in 2014 and then tumbled 99.89% in 2016.
  • A 5-year view of Work In Process shows it stood at $7.4 billion in 2013, then skyrocketed by 61.64% to $11.9 billion in 2014, then crashed by 99.95% to $6.2 million in 2015, then crashed by 99.89% to $6822.2 in 2016, then soared by 68.35% to $11485.2 in 2017.
  • Per Business Quant, the three most recent readings for HBM's Work In Process are $11485.2 (Q2 2017), $6822.2 (Q4 2016), and $7.3 million (Q2 2016).