Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)
Global-Smart.Tech (GSMT) posted Construction in Progress of $2100.0 for Q1 2026, down 25.0% sequentially from $2800.0 in Q3 2025, and down 40.0% YoY from $3500.0 in Q1 2025.
Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026) Analysis & Trends
Global-Smart.Tech has reported Construction in Progress for 3 years, with the latest figure at $2100.0 in Q1 2026.
- Quarterly Construction in Progress fell 40.0% year-over-year to $2100.0 in Q1 2026, while the trailing twelve-month figure through Feb 2026 was $2100.0 (down 40.0% YoY) and the FY2025 annual result came in at $3150.0, down 30.77% from the prior year.
- Construction in Progress slipped to $2100.0 in Q1 2026 per GSMT's latest filing, from $2800.0 in the prior quarter.
- Over five years, Construction in Progress peaked at $4550.0 in Q2 2024 and troughed at $2100.0 in Q1 2026.
- A 3-year average of $3450.0 and a median of $3500.0 in 2025 frame the typical range for Construction in Progress.
- The sharpest annual moves came in 2025 and 2026: Construction in Progress sank 30.77% in 2025, then tumbled 40.0% in 2026.
- Over 3 years, Construction in Progress stood at $3850.0 in 2024, then decreased by 27.27% to $2800.0 in 2025, then retreated by 25.0% to $2100.0 in 2026.
- According to Business Quant data, Construction in Progress over the past three periods registered $2100.0, $2800.0, and $3150.0 for Q1 2026, Q3 2025, and Q2 2025 respectively.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| May 31, 2026 | 1,750.00 |
| Feb 28, 2026 | 2,100.00 |
| Aug 31, 2025 | 2,800.00 |
| May 31, 2025 | 3,150.00 |
| Feb 28, 2025 | 3,500.00 |
| Nov 30, 2024 | 3,850.00 |
| Aug 31, 2024 | 4,200.00 |
| May 31, 2024 | 4,550.00 |