Global-Smart.Tech GSMT
GSMT

Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)

Global-Smart.Tech (GSMT) posted Construction in Progress of $2100.0 for Q1 2026, down 25.0% sequentially from $2800.0 in Q3 2025, and down 40.0% YoY from $3500.0 in Q1 2025.

Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026) Analysis & Trends

Global-Smart.Tech has reported Construction in Progress for 3 years, with the latest figure at $2100.0 in Q1 2026.

  • Quarterly Construction in Progress fell 40.0% year-over-year to $2100.0 in Q1 2026, while the trailing twelve-month figure through Feb 2026 was $2100.0 (down 40.0% YoY) and the FY2025 annual result came in at $3150.0, down 30.77% from the prior year.
  • Construction in Progress slipped to $2100.0 in Q1 2026 per GSMT's latest filing, from $2800.0 in the prior quarter.
  • Over five years, Construction in Progress peaked at $4550.0 in Q2 2024 and troughed at $2100.0 in Q1 2026.
  • A 3-year average of $3450.0 and a median of $3500.0 in 2025 frame the typical range for Construction in Progress.
  • The sharpest annual moves came in 2025 and 2026: Construction in Progress sank 30.77% in 2025, then tumbled 40.0% in 2026.
  • Over 3 years, Construction in Progress stood at $3850.0 in 2024, then decreased by 27.27% to $2800.0 in 2025, then retreated by 25.0% to $2100.0 in 2026.
  • According to Business Quant data, Construction in Progress over the past three periods registered $2100.0, $2800.0, and $3150.0 for Q1 2026, Q3 2025, and Q2 2025 respectively.

Peer Comparison

Historic Data

Download Data
DateValue
May 31, 2026 1,750.00
Feb 28, 2026 2,100.00
Aug 31, 2025 2,800.00
May 31, 2025 3,150.00
Feb 28, 2025 3,500.00
Nov 30, 2024 3,850.00
Aug 31, 2024 4,200.00
May 31, 2024 4,550.00