Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)

Global-Smart.Tech (GSMT) reported Construction in Progress of $2100.0 for Q1 2026, down 40.0% on a YoY basis from $3500.0 in Q1 2025, and down 25.0% sequentially from $2800.0 in Q3 2025.

Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026) Analysis & Trends

Global-Smart.Tech (GSMT) has 3 years of Construction in Progress data on file, last reported at $2100.0 in Q1 2026.

  • For the quarter ending Q1 2026, Construction in Progress fell 40.0% year-over-year to $2100.0; the trailing twelve-month figure through Feb 2026 stood at $2100.0 (down 40.0% YoY), and the FY2025 full-year result was $3150.0, down 30.77% from the prior year.
  • Construction in Progress slipped to $2100.0 in Q1 2026, from $2800.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4550.0 in Q2 2024 to a low of $2100.0 in Q1 2026.
  • A 3-year average of $3450.0 and a median of $3500.0 in 2025 frame the typical range for Construction in Progress.
  • Across the five-year window, Construction in Progress tumbled 30.77% in 2025 and sank 40.0% in 2026, its largest moves.
  • Tracing GSMT's Construction in Progress over 3 years: stood at $3850.0 in 2024, then declined by 27.27% to $2800.0 in 2025, then dropped by 25.0% to $2100.0 in 2026.
  • Business Quant data shows GSMT's Construction in Progress at $2100.0 in Q1 2026, $2800.0 in Q3 2025, and $3150.0 in Q2 2025.

Peer Comparison

Historic Data

Download Data
DateValue
Feb 28, 2026 2,100.00
Aug 31, 2025 2,800.00
May 31, 2025 3,150.00
Feb 28, 2025 3,500.00
Nov 30, 2024 3,850.00
Aug 31, 2024 4,200.00
May 31, 2024 4,550.00