Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)

Global-Smart.Tech recorded quarterly Construction in Progress of $2100.0 in Q1 2026, down 25.0% quarter-over-quarter from $2800.0 in Q3 2025, and down 40.0% year-over-year from $3500.0 in Q1 2025.

Global-Smart.Tech's Construction in Progress history runs 3 years deep, the most recent figure standing at $2100.0 for Q1 2026.

  • In Q1 2026, Construction in Progress fell 40.0% year-over-year to $2100.0; the TTM figure through Feb 2026 stood at $2100.0 (down 40.0% YoY), while the FY2025 annual figure was $3150.0, down 30.77% from the prior year.
  • Construction in Progress came in at $2100.0 for Q1 2026 at Global-Smart.Tech, down from $2800.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4550.0 in Q2 2024 to a low of $2100.0 in Q1 2026.
  • A 3-year average of $3450.0 and a median of $3500.0 in 2025 frame the typical range for Construction in Progress.
  • Across the five-year window, Construction in Progress plunged 30.77% in 2025 and slumped 40.0% in 2026, its largest moves.
  • Global-Smart.Tech's Construction in Progress stood at $3850.0 in 2024, then retreated by 27.27% to $2800.0 in 2025, then fell by 25.0% to $2100.0 in 2026.
  • According to Business Quant data, Construction in Progress over the past three periods registered $2100.0, $2800.0, and $3150.0 for Q1 2026, Q3 2025, and Q2 2025 respectively.

Historic Data

Download Data 🔒
DateValue
Feb 28, 2026 2,100.00
Aug 31, 2025 2,800.00
May 31, 2025 3,150.00
Feb 28, 2025 3,500.00
Nov 30, 2024 3,850.00
Aug 31, 2024 4,200.00
May 31, 2024 4,550.00