Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)

Global-Smart.Tech's (GSMT) quarterly Construction in Progress came in at $2100.0 in Q1 2026, down 40.0% year-on-year from $3500.0 in Q1 2025, and down 25.0% quarter-over-quarter from $2800.0 in Q3 2025.

Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026) Analysis & Trends

Global-Smart.Tech has disclosed Construction in Progress across 3 years of filings, most recently posting $2100.0 for Q1 2026.

  • Construction in Progress for Q1 2026 came in at $2100.0, down 40.0% year-over-year; the trailing twelve-month figure through Feb 2026 was $2100.0 (down 40.0% YoY), and the FY2025 annual result was $3150.0, down 30.77% from the prior year.
  • Construction in Progress came in at $2100.0 for Q1 2026 at Global-Smart.Tech, down from $2800.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4550.0 in Q2 2024 to a low of $2100.0 in Q1 2026.
  • The 3-year median for Construction in Progress is $3500.0 (2025), against an average of $3450.0.
  • Across the five-year window, Construction in Progress sank 30.77% in 2025 and tumbled 40.0% in 2026, its largest moves.
  • Global-Smart.Tech's Construction in Progress stood at $3850.0 in 2024, then fell by 27.27% to $2800.0 in 2025, then declined by 25.0% to $2100.0 in 2026.
  • The last three Construction in Progress figures came in at $2100.0 (Q1 2026), $2800.0 (Q3 2025), and $3150.0 (Q2 2025), per Business Quant data.

Peer Comparison

Historic Data

Download Data
DateValue
Feb 28, 2026 2,100.00
Aug 31, 2025 2,800.00
May 31, 2025 3,150.00
Feb 28, 2025 3,500.00
Nov 30, 2024 3,850.00
Aug 31, 2024 4,200.00
May 31, 2024 4,550.00