Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026)
Global-Smart.Tech's (GSMT) quarterly Construction in Progress came in at $2100.0 in Q1 2026, down 40.0% year-on-year from $3500.0 in Q1 2025, and down 25.0% quarter-over-quarter from $2800.0 in Q3 2025.
Global-Smart.Tech (GSMT) Construction in Progress (2024 - 2026) Analysis & Trends
Global-Smart.Tech has disclosed Construction in Progress across 3 years of filings, most recently posting $2100.0 for Q1 2026.
- Construction in Progress for Q1 2026 came in at $2100.0, down 40.0% year-over-year; the trailing twelve-month figure through Feb 2026 was $2100.0 (down 40.0% YoY), and the FY2025 annual result was $3150.0, down 30.77% from the prior year.
- Construction in Progress came in at $2100.0 for Q1 2026 at Global-Smart.Tech, down from $2800.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $4550.0 in Q2 2024 to a low of $2100.0 in Q1 2026.
- The 3-year median for Construction in Progress is $3500.0 (2025), against an average of $3450.0.
- Across the five-year window, Construction in Progress sank 30.77% in 2025 and tumbled 40.0% in 2026, its largest moves.
- Global-Smart.Tech's Construction in Progress stood at $3850.0 in 2024, then fell by 27.27% to $2800.0 in 2025, then declined by 25.0% to $2100.0 in 2026.
- The last three Construction in Progress figures came in at $2100.0 (Q1 2026), $2800.0 (Q3 2025), and $3150.0 (Q2 2025), per Business Quant data.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Feb 28, 2026 | 2,100.00 |
| Aug 31, 2025 | 2,800.00 |
| May 31, 2025 | 3,150.00 |
| Feb 28, 2025 | 3,500.00 |
| Nov 30, 2024 | 3,850.00 |
| Aug 31, 2024 | 4,200.00 |
| May 31, 2024 | 4,550.00 |