Fresenius Medical Care AG (FMCQF) Construction in Progress (2017 - 2018)
Fresenius Medical Care AG (FMCQF) posted quarterly Construction in Progress of $373527.0 for Q4 2018, down 1.89% year-over-year from $380728.0 in Q4 2017, and down 1.89% quarter-over-quarter from $380728.0 in Q4 2017.
Fresenius Medical Care AG (FMCQF) Construction in Progress (2017 - 2018) Analysis & Trends
Fresenius Medical Care AG's Construction in Progress history runs 2 years deep, the most recent figure standing at $373527.0 for Q4 2018.
- In Q4 2018, Construction in Progress fell 1.89% year-over-year to $373527.0; the TTM figure through Dec 2018 stood at $373527.0 (down 1.89% YoY), while the FY2018 annual figure was $373527.0, down 1.89% from the prior year.
- Construction in Progress for Q4 2018 stood at $373527.0, down from $380728.0 in the prior quarter.
- The five-year high for Construction in Progress was $380728.0 in Q4 2017, with the low at $373527.0 in Q4 2018.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2018 | 373,527.00 |
| Dec 31, 2017 | 380,728.00 |