Growth Metrics

Empire Petroleum (EP) Construction in Progress (2018 - 2025)

Historic Construction in Progress for Empire Petroleum (EP) over the last 8 years, with Q2 2025 value amounting to $144.0 million.

  • Empire Petroleum's Construction in Progress rose 1659.66% to $144.0 million in Q2 2025 from the same period last year, while for Jun 2025 it was $144.0 million, marking a year-over-year increase of 1659.66%. This contributed to the annual value of $140.7 million for FY2024, which is 5043.88% up from last year.
  • Per Empire Petroleum's latest filing, its Construction in Progress stood at $144.0 million for Q2 2025, which was up 1659.66% from $143.2 million recorded in Q1 2025.
  • Empire Petroleum's 5-year Construction in Progress high stood at $144.0 million for Q2 2025, and its period low was $22.7 million during Q1 2021.
  • Its 5-year average for Construction in Progress is $81.9 million, with a median of $68.1 million in 2023.
  • Over the last 5 years, Empire Petroleum's Construction in Progress had its largest YoY gain of 10843.66% in 2022, and its largest YoY loss of 1213.86% in 2022.
  • Empire Petroleum's Construction in Progress (Quarter) stood at $46.9 million in 2021, then soared by 36.39% to $64.0 million in 2022, then surged by 46.14% to $93.5 million in 2023, then skyrocketed by 50.44% to $140.7 million in 2024, then rose by 2.37% to $144.0 million in 2025.
  • Its Construction in Progress was $144.0 million in Q2 2025, compared to $143.2 million in Q1 2025 and $140.7 million in Q4 2024.