Empire Petroleum (EP) Construction in Progress (2018 - 2025)
Empire Petroleum's Construction in Progress history spans 8 years, with the latest figure at $144.0 million for Q2 2025.
- For Q2 2025, Construction in Progress rose 16.6% year-over-year to $144.0 million; the TTM value through Jun 2025 reached $144.0 million, up 16.6%, while the annual FY2024 figure was $140.7 million, 50.44% up from the prior year.
- Construction in Progress for Q2 2025 was $144.0 million at Empire Petroleum, up from $143.2 million in the prior quarter.
- Across five years, Construction in Progress topped out at $144.0 million in Q2 2025 and bottomed at $22.7 million in Q1 2021.
- The 5-year median for Construction in Progress is $68.1 million (2023), against an average of $81.9 million.
- The largest YoY upside for Construction in Progress was 108.44% in 2022 against a maximum downside of 12.14% in 2022.
- A 5-year view of Construction in Progress shows it stood at $46.9 million in 2021, then soared by 36.39% to $64.0 million in 2022, then surged by 46.14% to $93.5 million in 2023, then soared by 50.44% to $140.7 million in 2024, then increased by 2.37% to $144.0 million in 2025.
- Per Business Quant, the three most recent readings for EP's Construction in Progress are $144.0 million (Q2 2025), $143.2 million (Q1 2025), and $140.7 million (Q4 2024).