Growth Metrics

Empire Petroleum (EP) Construction in Progress (2018 - 2025)

Empire Petroleum's Construction in Progress history spans 8 years, with the latest figure at $144.0 million for Q2 2025.

  • On a quarterly basis, Construction in Progress rose 16.6% to $144.0 million in Q2 2025 year-over-year; TTM through Jun 2025 was $144.0 million, a 16.6% increase, with the full-year FY2024 number at $140.7 million, up 50.44% from a year prior.
  • Construction in Progress hit $144.0 million in Q2 2025 for Empire Petroleum, up from $143.2 million in the prior quarter.
  • Over the last five years, Construction in Progress for EP hit a ceiling of $144.0 million in Q2 2025 and a floor of $22.7 million in Q1 2021.
  • Historically, Construction in Progress has averaged $81.9 million across 5 years, with a median of $68.1 million in 2023.
  • The widest YoY moves for Construction in Progress: up 108.44% in 2022, down 12.14% in 2022.
  • Tracing EP's Construction in Progress over 5 years: stood at $46.9 million in 2021, then soared by 36.39% to $64.0 million in 2022, then surged by 46.14% to $93.5 million in 2023, then soared by 50.44% to $140.7 million in 2024, then increased by 2.37% to $144.0 million in 2025.
  • Business Quant data shows Construction in Progress for EP at $144.0 million in Q2 2025, $143.2 million in Q1 2025, and $140.7 million in Q4 2024.