Growth Metrics

Empire Petroleum (EP) Construction in Progress (2018 - 2025)

Empire Petroleum (EP) has disclosed Construction in Progress for 8 consecutive years, with $144.0 million as the latest value for Q2 2025.

  • Quarterly Construction in Progress rose 16.6% to $144.0 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $144.0 million through Jun 2025, up 16.6% year-over-year, with the annual reading at $140.7 million for FY2024, 50.44% up from the prior year.
  • Construction in Progress hit $144.0 million in Q2 2025 for Empire Petroleum, up from $143.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $144.0 million in Q2 2025 to a low of $22.7 million in Q1 2021.
  • Historically, Construction in Progress has averaged $81.9 million across 5 years, with a median of $68.1 million in 2023.
  • Biggest YoY gain for Construction in Progress was 108.44% in 2022; the steepest drop was 12.14% in 2022.
  • Year by year, Construction in Progress stood at $46.9 million in 2021, then skyrocketed by 36.39% to $64.0 million in 2022, then soared by 46.14% to $93.5 million in 2023, then skyrocketed by 50.44% to $140.7 million in 2024, then rose by 2.37% to $144.0 million in 2025.
  • Business Quant data shows Construction in Progress for EP at $144.0 million in Q2 2025, $143.2 million in Q1 2025, and $140.7 million in Q4 2024.