Bristol Myers Squibb (BMYMP) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Bristol Myers Squibb (BMYMP) over the last 12 years, with Q4 2025 value amounting to $1.6 billion.
- Bristol Myers Squibb's Construction in Progress rose 616.39% to $1.6 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $1.6 billion, marking a year-over-year increase of 616.39%. This contributed to the annual value of $1.6 billion for FY2025, which is 616.39% up from last year.
- Latest data reveals that Bristol Myers Squibb reported Construction in Progress of $1.6 billion as of Q4 2025, which was up 616.39% from $1.5 billion recorded in Q3 2025.
- In the past 5 years, Bristol Myers Squibb's Construction in Progress registered a high of $1.8 billion during Q2 2025, and its lowest value of $519.0 million during Q1 2021.
- Over the past 5 years, Bristol Myers Squibb's median Construction in Progress value was $1.1 billion (recorded in 2023), while the average stood at $1.1 billion.
- As far as peak fluctuations go, Bristol Myers Squibb's Construction in Progress surged by 6992.67% in 2021, and later soared by 208.93% in 2023.
- Quarter analysis of 5 years shows Bristol Myers Squibb's Construction in Progress stood at $764.0 million in 2021, then skyrocketed by 37.83% to $1.1 billion in 2022, then rose by 2.09% to $1.1 billion in 2023, then skyrocketed by 41.86% to $1.5 billion in 2024, then rose by 6.16% to $1.6 billion in 2025.
- Its last three reported values are $1.6 billion in Q4 2025, $1.5 billion for Q3 2025, and $1.8 billion during Q2 2025.