Bristol Myers Squibb (BMYMP) Construction in Progress (2016 - 2025)
Bristol Myers Squibb (BMYMP) has disclosed Construction in Progress for 11 consecutive years, with $1.6 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 6.16% to $1.6 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.6 billion through Dec 2025, up 6.16% year-over-year, with the annual reading at $1.6 billion for FY2025, 6.16% up from the prior year.
- Construction in Progress for Q4 2025 was $1.6 billion at Bristol Myers Squibb, up from $1.5 billion in the prior quarter.
- The five-year high for Construction in Progress was $1.8 billion in Q2 2025, with the low at $519.0 million in Q1 2021.
- Average Construction in Progress over 5 years is $1.1 billion, with a median of $1.1 billion recorded in 2023.
- The sharpest move saw Construction in Progress skyrocketed 69.93% in 2021, then rose 2.09% in 2023.
- Over 5 years, Construction in Progress stood at $764.0 million in 2021, then skyrocketed by 37.83% to $1.1 billion in 2022, then rose by 2.09% to $1.1 billion in 2023, then soared by 41.86% to $1.5 billion in 2024, then rose by 6.16% to $1.6 billion in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $1.6 billion, $1.5 billion, and $1.8 billion for Q4 2025, Q3 2025, and Q2 2025 respectively.