Blackwell 3D Construction (BDCC) Change in Accured Expenses (2016 - 2025)
Blackwell 3D Construction has reported Change in Accured Expenses over the past 11 years, most recently at $11798.0 for Q4 2025.
- Quarterly results put Change in Accured Expenses at $11798.0 for Q4 2025, down 36.79% from a year ago — trailing twelve months through Nov 2025 was $118182.0 (up 80.79% YoY), and the annual figure for FY2025 was $111112.0, up 75.4%.
- Change in Accured Expenses for Q4 2025 was $11798.0 at Blackwell 3D Construction, down from $15514.0 in the prior quarter.
- Over the last five years, Change in Accured Expenses for BDCC hit a ceiling of $65088.0 in Q1 2025 and a floor of -$10372.0 in Q2 2022.
- Median Change in Accured Expenses over the past 4 years was $10417.0 (2021), compared with a mean of $13673.2.
- Biggest five-year swings in Change in Accured Expenses: plummeted 329.67% in 2022 and later soared 1312.71% in 2025.
- Blackwell 3D Construction's Change in Accured Expenses stood at $9329.0 in 2021, then soared by 60.09% to $14935.0 in 2022, then rose by 24.97% to $18664.0 in 2024, then crashed by 36.79% to $11798.0 in 2025.
- The last three reported values for Change in Accured Expenses were $11798.0 (Q4 2025), $15514.0 (Q3 2025), and $25782.0 (Q2 2025) per Business Quant data.