Forafric Global PLC (AFRI) Construction in Progress (2021 - 2025)
Forafric Global (AFRI) posted Construction in Progress of $6.7 million for Q4 2025, little changed sequentially from $6.7 million in Q2 2025, and little changed YoY from $6.7 million in Q4 2024.
Forafric Global PLC (AFRI) Construction in Progress (2021 - 2025) Analysis & Trends
Forafric Global has reported Construction in Progress for 5 years, with the latest figure at $6.7 million in Q4 2025.
- Quarterly Construction in Progress changed 0.41% year-over-year to $6.7 million in Q4 2025, while the trailing twelve-month figure through Dec 2025 was $6.7 million (changed 0.41% YoY) and the FY2025 annual result came in at $6.7 million, changed 0.41% from the prior year.
- Construction in Progress steadied at $6.7 million in Q4 2025 per AFRI's latest filing, from $6.7 million in the prior quarter.
- Over five years, Construction in Progress peaked at $11.0 million in Q2 2023 and troughed at $5.4 million in Q4 2021.
- A 5-year average of $7.7 million and a median of $6.7 million in 2024 frame the typical range for Construction in Progress.
- The sharpest annual moves came in 2022 and 2024: Construction in Progress jumped 56.14% in 2022, then tumbled 38.43% in 2024.
- Over 5 years, Construction in Progress stood at $5.4 million in 2021, then surged by 56.14% to $8.5 million in 2022, then increased by 21.34% to $10.3 million in 2023, then tumbled by 35.1% to $6.7 million in 2024, then climbed by 0.41% to $6.7 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods registered $6.7 million, $6.7 million, and $6.7 million for Q4 2025, Q2 2025, and Q4 2024 respectively.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2025 | 6.69 Mn |
| Jun 30, 2025 | 6.71 Mn |
| Dec 31, 2024 | 6.66 Mn |
| Jun 30, 2024 | 6.75 Mn |
| Dec 31, 2023 | 10.26 Mn |
| Jun 30, 2023 | 10.97 Mn |
| Dec 31, 2022 | 8.46 Mn |
| Dec 31, 2021 | 5.42 Mn |