Forafric Global (AFRI) Construction in Progress (2021 - 2024)
Forafric Global's Construction in Progress history spans 4 years, with the latest figure at $6.7 million for Q4 2024.
- For Q4 2024, Construction in Progress fell 35.1% year-over-year to $6.7 million; the TTM value through Dec 2024 reached $6.7 million, down 35.1%, while the annual FY2024 figure was $6.7 million, 35.1% down from the prior year.
- Construction in Progress for Q4 2024 was $6.7 million at Forafric Global, down from $10.3 million in the prior quarter.
- Across five years, Construction in Progress topped out at $10.3 million in Q4 2023 and bottomed at $5.4 million in Q4 2021.
- The 4-year median for Construction in Progress is $7.6 million (2022), against an average of $7.7 million.
- The largest annual shift saw Construction in Progress soared 56.14% in 2022 before it crashed 35.1% in 2024.
- A 4-year view of Construction in Progress shows it stood at $5.4 million in 2021, then skyrocketed by 56.14% to $8.5 million in 2022, then grew by 21.34% to $10.3 million in 2023, then tumbled by 35.1% to $6.7 million in 2024.
- Per Business Quant, the three most recent readings for AFRI's Construction in Progress are $6.7 million (Q4 2024), $10.3 million (Q4 2023), and $8.5 million (Q4 2022).