Tennessee Valley Authority (TVE) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Tennessee Valley Authority (TVE) over the last 16 years, with Q4 2025 value amounting to $7.2 billion.

  • Tennessee Valley Authority's Construction in Progress rose 3180.48% to $7.2 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $7.2 billion, marking a year-over-year increase of 3180.48%. This contributed to the annual value of $6.8 billion for FY2025, which is 3855.3% up from last year.
  • Tennessee Valley Authority's Construction in Progress amounted to $7.2 billion in Q4 2025, which was up 3180.48% from $6.8 billion recorded in Q3 2025.
  • In the past 5 years, Tennessee Valley Authority's Construction in Progress ranged from a high of $7.2 billion in Q4 2025 and a low of $2.2 billion during Q2 2021
  • For the 5-year period, Tennessee Valley Authority's Construction in Progress averaged around $3.8 billion, with its median value being $3.2 billion (2023).
  • In the last 5 years, Tennessee Valley Authority's Construction in Progress skyrocketed by 146.52% in 2022 and then surged by 6537.55% in 2025.
  • Tennessee Valley Authority's Construction in Progress (Quarter) stood at $2.5 billion in 2021, then grew by 6.09% to $2.6 billion in 2022, then rose by 29.34% to $3.4 billion in 2023, then soared by 58.54% to $5.4 billion in 2024, then skyrocketed by 31.8% to $7.2 billion in 2025.
  • Its last three reported values are $7.2 billion in Q4 2025, $6.8 billion for Q3 2025, and $6.0 billion during Q2 2025.