Rexford Industrial Realty (REXR-PC) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Rexford Industrial Realty (REXR-PC) over the last 12 years, with Q4 2025 value amounting to $451.1 million.
- Rexford Industrial Realty's Construction in Progress rose 3518.8% to $451.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $451.1 million, marking a year-over-year increase of 3518.8%. This contributed to the annual value of $451.1 million for FY2025, which is 3518.8% up from last year.
- According to the latest figures from Q4 2025, Rexford Industrial Realty's Construction in Progress is $451.1 million, which was up 3518.8% from $475.1 million recorded in Q3 2025.
- Rexford Industrial Realty's 5-year Construction in Progress high stood at $475.1 million for Q3 2025, and its period low was $33.2 million during Q2 2021.
- In the last 5 years, Rexford Industrial Realty's Construction in Progress had a median value of $157.7 million in 2023 and averaged $213.0 million.
- Examining YoY changes over the last 5 years, Rexford Industrial Realty's Construction in Progress showed a top increase of 18146.94% in 2021 and a maximum decrease of 1658.3% in 2021.
- Quarter analysis of 5 years shows Rexford Industrial Realty's Construction in Progress stood at $71.4 million in 2021, then skyrocketed by 55.42% to $110.9 million in 2022, then surged by 116.35% to $240.0 million in 2023, then surged by 39.03% to $333.7 million in 2024, then soared by 35.19% to $451.1 million in 2025.
- Its last three reported values are $451.1 million in Q4 2025, $475.1 million for Q3 2025, and $431.8 million during Q2 2025.