Public Storage (PSA-PI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Public Storage (PSA-PI) over the last 17 years, with Q4 2025 value amounting to $194.4 million.
- Public Storage's Construction in Progress fell 3691.84% to $194.4 million in Q4 2025 from the same period last year, while for Dec 2025 it was $194.4 million, marking a year-over-year decrease of 3691.84%. This contributed to the annual value of $194.4 million for FY2025, which is 3691.84% down from last year.
- According to the latest figures from Q4 2025, Public Storage's Construction in Progress is $194.4 million, which was down 3691.84% from $267.8 million recorded in Q3 2025.
- In the past 5 years, Public Storage's Construction in Progress ranged from a high of $457.1 million in Q3 2023 and a low of $194.4 million during Q4 2025
- For the 5-year period, Public Storage's Construction in Progress averaged around $321.4 million, with its median value being $324.0 million (2022).
- In the last 5 years, Public Storage's Construction in Progress soared by 7792.97% in 2022 and then tumbled by 3817.55% in 2025.
- Over the past 5 years, Public Storage's Construction in Progress (Quarter) stood at $272.5 million in 2021, then skyrocketed by 36.89% to $373.0 million in 2022, then decreased by 7.38% to $345.5 million in 2023, then decreased by 10.81% to $308.1 million in 2024, then tumbled by 36.92% to $194.4 million in 2025.
- Its last three reported values are $194.4 million in Q4 2025, $267.8 million for Q3 2025, and $257.3 million during Q2 2025.