Procaccianti Hotel Reit (PRXA) Construction in Progress (2018 - 2020)
Procaccianti Hotel Reit (PRXA) recorded quarterly Construction in Progress of $8027.0 in Q1 2020, down 35.86% quarter-over-quarter from $12515.0 in Q1 2019, and down 35.86% on a YoY basis from $12515.0 in Q2 2019.
Procaccianti Hotel Reit (PRXA) Construction in Progress (2018 - 2020) Analysis & Trends
Procaccianti Hotel Reit's Construction in Progress history runs 3 years deep, the most recent figure standing at $8027.0 for Q1 2020.
- In Q1 2020, Construction in Progress fell 35.86% year-over-year to $8027.0; the TTM figure through Mar 2020 stood at $8027.0 (down 35.86% YoY), while the FY2018 annual figure was $12837.0, changed N/A from the prior year.
- Construction in Progress was $8027.0 for Q1 2020 at Procaccianti Hotel Reit, down from $12515.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $12837.0 in Q4 2018 to a low of $8027.0 in Q1 2020.
- Historically, Construction in Progress has averaged $11126.3 across 3 years, with a median of $12515.0 in 2019.
- Biggest YoY gain for Construction in Progress was 35.86% in 2020; the steepest drop was 35.86% in 2020.
- A 3-year view of Construction in Progress shows it stood at $12837.0 in 2018, then fell by 2.51% to $12515.0 in 2019, then tumbled by 35.86% to $8027.0 in 2020.
- The last three Construction in Progress figures came in at $8027.0 (Q1 2020), $12515.0 (Q1 2019), and $12837.0 (Q4 2018), per Business Quant data.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2020 | 8,027.00 |
| Mar 31, 2019 | 12,515.00 |
| Dec 31, 2018 | 12,837.00 |