Kodiak AI, Inc. (KDKRW) Construction in Progress (2024 - 2026)

Kodiak AI (KDKRW) posted quarterly Construction in Progress of $10.3 million for Q1 2026, little changed quarter-over-quarter from $10.4 million in Q4 2025.

Kodiak AI, Inc. (KDKRW) Construction in Progress (2024 - 2026) Analysis & Trends

Kodiak AI's Construction in Progress history runs 3 years deep, the most recent figure standing at $10.3 million for Q1 2026.

  • In Q1 2026, Construction in Progress changed N/A year-over-year to $10.3 million; the TTM figure through Mar 2026 stood at $10.3 million (changed N/A YoY), while the FY2025 annual figure was $10.4 million, up 958.41% from the prior year.
  • Construction in Progress for Q1 2026 stood at $10.3 million, roughly flat from $10.4 million in the prior quarter.
  • The five-year high for Construction in Progress was $10.4 million in Q4 2025, with the low at $981000.0 in Q4 2024.
  • The 3-year median for Construction in Progress is $8.8 million (2025), against an average of $7.2 million.
  • Peak annual rise in Construction in Progress reached 958.41% in 2025, while the deepest fall reached 958.41% in 2025.
  • Kodiak AI's Construction in Progress stood at $981000.0 in 2024, then jumped by 958.41% to $10.4 million in 2025, then dropped by 0.49% to $10.3 million in 2026.
  • Business Quant data shows KDKRW's Construction in Progress at $10.3 million in Q1 2026, $10.4 million in Q4 2025, and $7.2 million in Q3 2025.

Peer Comparison

Historic Data

Download Data
DateValue
Jun 30, 2026 8.53 Mn
Mar 31, 2026 10.33 Mn
Dec 31, 2025 10.38 Mn
Sep 30, 2025 7.25 Mn
Dec 31, 2024 981,000.00