Kodiak AI, Inc. (KDKRW) Construction in Progress (2024 - 2026)
Kodiak AI's (KDKRW) quarterly Construction in Progress came in at $10.3 million in Q1 2026, little changed quarter-over-quarter from $10.4 million in Q4 2025.
Kodiak AI, Inc. (KDKRW) Construction in Progress (2024 - 2026) Analysis & Trends
Kodiak AI's Construction in Progress history runs 3 years deep, the most recent figure standing at $10.3 million for Q1 2026.
- On a quarterly basis, Construction in Progress changed N/A year-over-year to $10.3 million in Q1 2026; TTM through Mar 2026 was $10.3 million, a N/A change from a year earlier, with the FY2025 full-year figure at $10.4 million, up 958.41% from the prior year.
- Construction in Progress steadied at $10.3 million in Q1 2026 per KDKRW's latest filing, from $10.4 million in the prior quarter.
- Across five years, Construction in Progress topped out at $10.4 million in Q4 2025 and bottomed at $981000.0 in Q4 2024.
- The 3-year median for Construction in Progress is $8.8 million (2025), against an average of $7.2 million.
- Biggest YoY gain for Construction in Progress was 958.41% in 2025; the steepest drop was 958.41% in 2025.
- Year by year, Construction in Progress stood at $981000.0 in 2024, then surged by 958.41% to $10.4 million in 2025, then declined by 0.49% to $10.3 million in 2026.
- Per Business Quant, the three latest KDKRW Construction in Progress figures stand at $10.3 million (Q1 2026), $10.4 million (Q4 2025), and $7.2 million (Q3 2025).
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2026 | 10.33 Mn |
| Dec 31, 2025 | 10.38 Mn |
| Sep 30, 2025 | 7.25 Mn |
| Dec 31, 2024 | 981,000.00 |