JD.com, Inc. (JDCMF) Construction in Progress (2016 - 2024)
JD.com (JDCMF) has disclosed Construction in Progress for 11 consecutive years, with $1.4 billion as the latest value for Q4 2023.
- On a quarterly basis, Construction in Progress fell 12.2% to $1.4 billion in Q4 2023 year-over-year; TTM through Dec 2023 was $1.4 billion, a 12.2% decrease, with the full-year FY2023 number at $1.4 billion, down 15.56% from a year prior.
- Construction in Progress was $1.4 billion for Q4 2023 at JD.com, down from $1.6 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.6 billion in Q4 2022 to a low of $823.8 million in Q4 2019.
- A 5-year average of $1.2 billion and a median of $1.2 billion in 2020 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: fell 23.73% in 2021, then soared 72.48% in 2022.
- JD.com's Construction in Progress stood at $823.8 million in 2019, then surged by 44.81% to $1.2 billion in 2020, then dropped by 23.73% to $909.8 million in 2021, then skyrocketed by 72.48% to $1.6 billion in 2022, then dropped by 12.2% to $1.4 billion in 2023.
- Per Business Quant, the three most recent readings for JDCMF's Construction in Progress are $1.4 billion (Q4 2023), $1.6 billion (Q4 2022), and $909.8 million (Q4 2021).