Emera Inc (ERRAF) Construction in Progress (2009 - 2025)

Emera's (ERRAF) quarterly Construction in Progress came in at $1.7 billion in Q4 2025, down 19.29% year-on-year from $2.1 billion in Q4 2024, and down 19.29% on a QoQ basis from $2.1 billion in Q4 2024.

Emera Inc (ERRAF) Construction in Progress (2009 - 2025) Analysis & Trends

Emera (ERRAF) has 10 years of Construction in Progress data on file, last reported at $1.7 billion in Q4 2025.

  • On a quarterly basis, Construction in Progress fell 19.29% year-over-year to $1.7 billion in Q4 2025; TTM through Dec 2025 was $1.7 billion, a 19.29% decrease from a year earlier, with the FY2025 full-year figure at $1.7 billion, down 20.9% from the prior year.
  • Construction in Progress for Q4 2025 stood at $1.7 billion, down from $2.1 billion in the prior quarter.
  • Over the last five years, Construction in Progress for ERRAF reached as high as $2.1 billion in Q4 2024 and fell as low as $1.5 billion in Q4 2022.
  • Historically, Construction in Progress has averaged $1.7 billion across 5 years, with a median of $1.7 billion in 2025.
  • Across the five-year window, Construction in Progress soared 37.52% in 2024 and decreased 19.29% in 2025, its largest moves.
  • Year by year, Construction in Progress stood at $1.8 billion in 2021, then dropped by 16.74% to $1.5 billion in 2022, then gained by 4.86% to $1.5 billion in 2023, then surged by 37.52% to $2.1 billion in 2024, then slipped by 19.29% to $1.7 billion in 2025.
  • Per Business Quant data, the three most recent Construction in Progress figures were $1.7 billion in Q4 2025, $2.1 billion in Q4 2024, and $1.5 billion in Q4 2023.

Peer Comparison

Historic Data

Download Data
DateValue
Dec 31, 2025 1.71 Bn
Dec 31, 2024 2.12 Bn
Dec 31, 2023 1.54 Bn
Dec 31, 2022 1.47 Bn
Dec 31, 2021 1.76 Bn
Dec 31, 2020 1.81 Bn
Dec 31, 2019 1.21 Bn
Dec 31, 2018 936.42 Mn
Dec 31, 2010 3.78 Bn
Dec 31, 2009 3.15 Bn