Emera Inc (ERRAF) Construction in Progress (2009 - 2025)
Emera's (ERRAF) quarterly Construction in Progress came in at $1.7 billion in Q4 2025, down 19.29% year-on-year from $2.1 billion in Q4 2024, and down 19.29% on a QoQ basis from $2.1 billion in Q4 2024.
Emera Inc (ERRAF) Construction in Progress (2009 - 2025) Analysis & Trends
Emera (ERRAF) has 10 years of Construction in Progress data on file, last reported at $1.7 billion in Q4 2025.
- On a quarterly basis, Construction in Progress fell 19.29% year-over-year to $1.7 billion in Q4 2025; TTM through Dec 2025 was $1.7 billion, a 19.29% decrease from a year earlier, with the FY2025 full-year figure at $1.7 billion, down 20.9% from the prior year.
- Construction in Progress for Q4 2025 stood at $1.7 billion, down from $2.1 billion in the prior quarter.
- Over the last five years, Construction in Progress for ERRAF reached as high as $2.1 billion in Q4 2024 and fell as low as $1.5 billion in Q4 2022.
- Historically, Construction in Progress has averaged $1.7 billion across 5 years, with a median of $1.7 billion in 2025.
- Across the five-year window, Construction in Progress soared 37.52% in 2024 and decreased 19.29% in 2025, its largest moves.
- Year by year, Construction in Progress stood at $1.8 billion in 2021, then dropped by 16.74% to $1.5 billion in 2022, then gained by 4.86% to $1.5 billion in 2023, then surged by 37.52% to $2.1 billion in 2024, then slipped by 19.29% to $1.7 billion in 2025.
- Per Business Quant data, the three most recent Construction in Progress figures were $1.7 billion in Q4 2025, $2.1 billion in Q4 2024, and $1.5 billion in Q4 2023.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2025 | 1.71 Bn |
| Dec 31, 2024 | 2.12 Bn |
| Dec 31, 2023 | 1.54 Bn |
| Dec 31, 2022 | 1.47 Bn |
| Dec 31, 2021 | 1.76 Bn |
| Dec 31, 2020 | 1.81 Bn |
| Dec 31, 2019 | 1.21 Bn |
| Dec 31, 2018 | 936.42 Mn |
| Dec 31, 2010 | 3.78 Bn |
| Dec 31, 2009 | 3.15 Bn |