Emera (ERRAF) Construction in Progress (2018 - 2025)
Emera (ERRAF) has disclosed Construction in Progress for 8 consecutive years, with $1.7 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress fell 19.29% to $1.7 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.7 billion through Dec 2025, down 19.29% year-over-year, with the annual reading at $1.7 billion for FY2025, 20.9% down from the prior year.
- Construction in Progress for Q4 2025 was $1.7 billion at Emera, down from $2.1 billion in the prior quarter.
- The five-year high for Construction in Progress was $2.1 billion in Q4 2024, with the low at $1.5 billion in Q4 2022.
- Average Construction in Progress over 5 years is $1.7 billion, with a median of $1.7 billion recorded in 2025.
- The sharpest move saw Construction in Progress soared 37.52% in 2024, then decreased 19.29% in 2025.
- Over 5 years, Construction in Progress stood at $1.8 billion in 2021, then dropped by 16.74% to $1.5 billion in 2022, then rose by 4.86% to $1.5 billion in 2023, then soared by 37.52% to $2.1 billion in 2024, then fell by 19.29% to $1.7 billion in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $1.7 billion, $2.1 billion, and $1.5 billion for Q4 2025, Q4 2024, and Q4 2023 respectively.