Cms Energy (CMSD) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Cms Energy (CMSD) over the last 17 years, with Q4 2025 value amounting to $3.1 billion.
- Cms Energy's Construction in Progress rose 4547.19% to $3.1 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $3.1 billion, marking a year-over-year increase of 4547.19%. This contributed to the annual value of $3.1 billion for FY2025, which is 4547.19% up from last year.
- Latest data reveals that Cms Energy reported Construction in Progress of $3.1 billion as of Q4 2025, which was up 4547.19% from $3.2 billion recorded in Q3 2025.
- Cms Energy's Construction in Progress' 5-year high stood at $3.2 billion during Q3 2025, with a 5-year trough of $832.0 million in Q2 2021.
- Its 5-year average for Construction in Progress is $1.5 billion, with a median of $1.2 billion in 2022.
- As far as peak fluctuations go, Cms Energy's Construction in Progress crashed by 3238.36% in 2021, and later surged by 13047.62% in 2025.
- Cms Energy's Construction in Progress (Quarter) stood at $961.0 million in 2021, then increased by 23.0% to $1.2 billion in 2022, then decreased by 20.14% to $944.0 million in 2023, then surged by 122.25% to $2.1 billion in 2024, then surged by 45.47% to $3.1 billion in 2025.
- Its last three reported values are $3.1 billion in Q4 2025, $3.2 billion for Q3 2025, and $2.8 billion during Q2 2025.